Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
From MaRDI portal
Publication:2565776
Recommendations
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem
- Two-machine group scheduling problem with blocking and anticipatory setups
- Two-machine flowshop group scheduling problem
- Scheduling unrelated parallel machines with sequence-dependent setups
- The two-machine sequence dependent flowshop scheduling problem
Cites work
- A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
- Analysis of Heuristics for Preemptive Parallel Machine Scheduling with Batch Setup Times
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications
- scientific article; zbMATH DE number 3895002 (Why is no real title available?)
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- On the Complexity of Scheduling with Batch Setup Times
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling Groups of Jobs on a Single Machine
- Scheduling with batching: A review
- Sequencing n jobs on two machines with setup, processing and removal times separated
- Some New Branching and Bounding Criteria for the Asymmetric Travelling Salesman Problem
- The two-machine sequence dependent flowshop scheduling problem
- Two-machine group scheduling problem with blocking and anticipatory setups
Cited in
(11)- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
- A comprehensive review of flowshop group scheduling literature
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem
- A survey of scheduling problems with setup times or costs
- A review of TSP based approaches for flowshop scheduling
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups
- A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem
- Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
This page was built for publication: Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2565776)