Two-machine flowshop group scheduling problem
From MaRDI portal
Recommendations
Cites work
- scientific article; zbMATH DE number 3689114 (Why is no real title available?)
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
- OPTIMAL SCHEDULE IN A GT-TYPE FLOW-SHOP UNDER SERIES-PARALLEL PRECEDENCE CONSTRAINTS
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Sequency on two and three machines with setup, processing and removal times separated
- TWO-AND THREE-MACHINE FLOW-SHOP MAKESPAN SCHEDULING PROBLEMS WITH ADDITIONAL TIMES SEPARATED FROM PROCESSING TIMES
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
Cited in
(20)- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
- Multi-family scheduling in a two-machine reentrant flow shop with setups
- Group scheduling in a two-stage flowshop
- Single-machine group scheduling with a time-dependent learning effect
- Scheduling in manufacturing with transportation: classification and solution techniques
- Optimization of processing and delivery decisions involving third-party machines
- Group scheduling on two cells with intercell movement
- Two-machine group scheduling problem with blocking and anticipatory setups
- scientific article; zbMATH DE number 2219503 (Why is no real title available?)
- A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem
- A comprehensive review of flowshop group scheduling literature
- Trade-off between time complexity and makespan for flexible flow-shop group scheduling problems with two machine centers
- A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- A survey of scheduling problems with setup times or costs
- Two machines flowshop scheduling problem with disintegration consideration
- Group-shop scheduling with sequence-dependent set-up and transportation times
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- Généralisation Max-Plus des bornes de Lageweg, Lenstra et Rinnooy Kan
This page was built for publication: Two-machine flowshop group scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1577379)