Group scheduling on two cells with intercell movement
From MaRDI portal
Publication:2563903
Recommendations
- Group scheduling in a two-stage flowshop
- Group scheduling with general position-dependent effect
- The complexity of two group scheduling problems
- Group Scheduling with Two Competing Agents on a Single Machine
- Solving group interval scheduling efficiently
- Group-based Pfair scheduling
- Two-machine flowshop group scheduling problem
- Two-machine group scheduling problem with blocking and anticipatory setups
- The task assignment problem for unrestricted movement between workstation groups
- The study of group scheduling problems with general dual-position-based job processing times
Cites work
Cited in
(4)- A comprehensive review of flowshop group scheduling literature
- Heuristics for operator scheduling in group technology cells
- Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
This page was built for publication: Group scheduling on two cells with intercell movement
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2563903)