Loading and scheduling of a flexible assembly system by mixed integer programming.
From MaRDI portal
Publication:1420407
DOI10.1016/S0377-2217(02)00795-6zbMath1099.90023MaRDI QIDQ1420407
Publication date: 2 February 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Mixed integer programming (90C11) Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items
Loading and scheduling for flexible manufacturing systems with controllable processing times ⋮ Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) ⋮ Operational extended model formulations for advanced planning and scheduling systems ⋮ Scheduling flexible manufacturing cells using Tabu Search ⋮ Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system ⋮ A note on ``A mixed integer programming model for advanced planning and scheduling (APS)
Cites Work
- Analytical loading models in flexible manufacturing systems
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Maximizing Submodular Set Functions: Formulations and Analysis of Algorithms
- Simultaneous versus sequential loading and scheduling of flexible assembly systems
- Mixed integer programming for scheduling surface mount technology lines
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Unnamed Item
- Unnamed Item
- Unnamed Item