Scheduling independent 2-processor tasks to minimize schedule length (Q796987): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Q4131987 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Characterization of Connection Assignment of Diagnosable Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3929047 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization of Reduced Dependencies for Synchronous Sequential Machines / rank
 
Normal rank

Revision as of 12:34, 14 June 2024

scientific article
Language Label Description Also known as
English
Scheduling independent 2-processor tasks to minimize schedule length
scientific article

    Statements

    Scheduling independent 2-processor tasks to minimize schedule length (English)
    0 references
    0 references
    0 references
    0 references
    1984
    0 references
    The problem considered in this paper is the deterministic scheduling of tasks on a set of identical processors. However, the model presented differs from the classical one by the requirement that certain tasks need more than one processor at a time for their processing. In the paper an O(n log n) algorithm is given for scheduling n preemtable tasks on m processors to minimize schedule length, when tasks are divided into two subsets. Each task from the first subset requires one processor at a time, and each task from the second subset requires two processors at a time for its processing.
    0 references
    multiprocessor tasks
    0 references
    polynomial-time algorithm
    0 references
    deterministic scheduling
    0 references
    identical processors
    0 references

    Identifiers