A mixed integer program for loading and scheduling multiple flexible manufacturing cells (Q1082246): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0377-2217(86)90031-7 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2055722863 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4658190 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Review of sequencing research / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-Bound Solution to the General Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Review of Production Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: KBSS: A knowledge-based system for scheduling in automated manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job-Shop Scheduling by Implicit Enumeration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 15:24, 17 June 2024

scientific article
Language Label Description Also known as
English
A mixed integer program for loading and scheduling multiple flexible manufacturing cells
scientific article

    Statements

    A mixed integer program for loading and scheduling multiple flexible manufacturing cells (English)
    0 references
    0 references
    0 references
    1986
    0 references
    The loading and scheduling of multiple, flexible manufacturing cells is addressed. A flexible manufacturing system may contain two or more flexible manufacturing cells, where each cell is independent but receives its jobs from a common arrival queue. The procedure for this loading and scheduling is via a mixed integer programming formulation. Several objective functions are presented including: minimizing makespan, minimizing mean flowtime, and minimizing mean lateness. The paper contains a brief discussion of why loading of multiple flexible manufacturing cells is important. It also presents the problem and system in question, reviews the applicable past research and details the necessary assumptions. The mixed integer formulation is then presented and explained, followed by a discussion of the number of variables and constraints necessary to solve the program for a real world sized system. And finally, a simple numeric example is given.
    0 references
    loading
    0 references
    scheduling
    0 references
    multiple, flexible manufacturing cells
    0 references
    flexible manufacturing system
    0 references
    minimizing makespan
    0 references
    minimizing mean flowtime
    0 references
    minimizing mean lateness
    0 references

    Identifiers