Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems (Q1821677): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Assembly-Line Balancing—Dynamic Programming with Precedence Constraints / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: An Algorithm for the Line Balancing Problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Assembly line balancing as generalized bin packing / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4770752 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: On Dynamic Programming Methods for Assembly Line Balancing / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Preference Order Dynamic Program for Stochastic Assembly Line Balancing / rank | |||
Normal rank |
Latest revision as of 19:30, 17 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems |
scientific article |
Statements
Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems (English)
0 references
1986
0 references
The dynamic programming method which minimizes the number of stations for a given cycle time is extended here to solve two variants of the assembly-line balancing problem. The extended method minimizes cycle time for a given number of stations or, more generally, computes all nondominated pairs of cycle time and number of stations. The method is also applied to the stochastic case where minimizing critical cycle time, the number of stations and maximizing confidence level is desired.
0 references
assembly-line balancing problem
0 references
nondominated pairs of cycle time and number of stations
0 references
stochastic case
0 references
0 references