A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (Q579120): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 5 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0305-0548(87)90033-5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2037003659 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to Minimize Maximum Cumulative Cost Subject to Series-Parallel Precedence Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing to Minimize the Maximum Job Cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing mean absolute deviation of completion times about a common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Mean Squared Deviation of Completion Times About a Common Due Date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the average deviation of job completion times about a common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the sum of absolute lateness in single-machine and multimachine scheduling / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 10:03, 18 June 2024

scientific article
Language Label Description Also known as
English
A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden
scientific article

    Statements

    A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (English)
    0 references
    0 references
    0 references
    1987
    0 references
    The concept of job earliness as a measure of inventory costs for single machine scheduling is introduced. The justification of earliness as a cost is presented. It is pointed out that the Japanese have long recognized earliness as a cost. The additon of earliness greatly complicated finding an optimum solution, since reducing earliness may require the insertion of machine idle time. Another measure commonly used to represent inventory cost is flowtime. In this paper, a combination of earliness and flowtime is used to represent total inventory costs. Some preliminary results are presented illustrating the complexity of solving this problem.
    0 references
    job earliness
    0 references
    measure of inventory costs
    0 references
    single machine scheduling
    0 references
    flowtime
    0 references

    Identifiers