A heuristic algorithm to schedule work in the repair industry (Q3354848): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q1904683
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Bobbie L. Foote / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207549108948091 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2032316650 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Comparative Study of Flow-Shop Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Functional Heuristic Algorithm for the Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4331739 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey and evaluation of static flowshop scheduling heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Tests for Initialization Bias in Simulation Output / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Elimination Methods in the <i>m</i> × <i>n</i> Flow-Shop Scheduling Problem / rank
 
Normal rank

Latest revision as of 17:59, 21 June 2024