Numerical method for determination of reworking or scraping the defective items in a finite production rate model (Q5467003): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1002/cnm.819 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2016750656 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A finite production model with random defective rate and shortages allowed and backordered / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5358751 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximations to production lot sizing with machine breakdowns. / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 13:30, 24 June 2024

scientific article; zbMATH DE number 5025488
Language Label Description Also known as
English
Numerical method for determination of reworking or scraping the defective items in a finite production rate model
scientific article; zbMATH DE number 5025488

    Statements

    Numerical method for determination of reworking or scraping the defective items in a finite production rate model (English)
    0 references
    0 references
    0 references
    0 references
    23 May 2006
    0 references
    manufacturing
    0 references
    production
    0 references
    rework-or-scrap
    0 references
    finite production model
    0 references
    defective items
    0 references

    Identifiers