Numerical method for determination of reworking or scraping the defective items in a finite production rate model
From MaRDI portal
Publication:5467003
DOI10.1002/cnm.819zbMath1090.90060OpenAlexW2016750656MaRDI QIDQ5467003
Huang-Chieh Chao, Yuan-Shyi Peter Chiu, Singa Wang Chiu
Publication date: 23 May 2006
Published in: Communications in Numerical Methods in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/cnm.819
Related Items (7)
Effect of repair cost on the rework decision-making in an economic production quantity model ⋮ Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns ⋮ Three-layer supply chain - A production-inventory model for reworkable items ⋮ Maximising profits for an EPQ model with unreliable machine and rework of random defective items ⋮ Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging ⋮ Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions ⋮ Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
Cites Work
- Unnamed Item
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Approximations to production lot sizing with machine breakdowns.
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- A finite production model with random defective rate and shortages allowed and backordered
This page was built for publication: Numerical method for determination of reworking or scraping the defective items in a finite production rate model