Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

From MaRDI portal
Publication:869601

DOI10.1016/j.ejor.2006.05.005zbMath1123.90002OpenAlexW4239084467MaRDI QIDQ869601

Singa Wang Chiu, Yuan-Shyi Peter Chiu, Shan-Ling Wang

Publication date: 8 March 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.05.005




Related Items (38)

On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdownSolving production lot size problem with an improved delivery policy and failure in rework by a simplifi ed solution procedureA disruption recovery plan in a three-stage production-inventory systemStochastic machine breakdown and discrete delivery in an imperfect inventory-production systemMultiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraintAn economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdownOptimal production run in an imperfect production process with maintenance under warranty and product insuranceDelayed payment policy in multi-product single-machine economic production quantity model with repair failure and partial backorderingSingle-machine scheduling with autonomous and induced learning to minimize total weighted number of tardy jobsModeling an inventory problem with random supply, inspection and machine breakdownManaging risk and disruption in production-inventory and supply chain systems: a reviewJoint determination of optimal safety stocks and production policy for an imperfect production systemAn EPQ model with inflation in an imperfect production systemOptimal deteriorating items production inventory models with random machine breakdown and stochastic repair timeA constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backorderingThree-layer supply chain - A production-inventory model for reworkable itemsEconomic production quantity model for deteriorating inventory with random machine unavailability and shortageScheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penaltiesA genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained spaceProduction decision making considering dual material types and setup time uncertaintyDetermining optimal lot size problem with rework and multiple deliveries using algebraic approachSolving fi nite production rate model with scrap and multiple deliveriesPricing and production decisions in multi-product single machine manufacturing system with discrete delivery and reworkInventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investmentMaximising profits for an EPQ model with unreliable machine and rework of random defective itemsImperfect production system under reverse logistics in stock-out situation: EPQ modelOptimization of the finite production rate model with scrap, rework and stochastic machine breakdownEconomic production quantity model with repair failure and limited capacityAn economic production quantity model with a positive resetup point under random demandEconomic lot sizing in a production system with random demandHeuristics for the economic production quantity problem under restrictions on production and maintenance timeReal time disruption management for a two-stage batch production-inventory system with reliability considerationsProduction lot sizing with quality screening and reworkA two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with reworkImperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periodsEconomic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristicA note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdownsOptimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach



Cites Work


This page was built for publication: Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns