An EPQ model for deteriorating production system and items with rework
From MaRDI portal
Publication:1667059
DOI10.1155/2015/957970zbMATH Open1394.90032OpenAlexW1980141593WikidataQ59120057 ScholiaQ59120057MaRDI QIDQ1667059FDOQ1667059
Authors: Peng Zhang
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/957970
Recommendations
- Lotsizing in a production system with rework and product deterioration
- An EPQ model for an imperfect production system with rework and shortages
- Lot sizing in a production system with rework and product deterioration
- Economic production quantity (EPQ) model for three type imperfect items with rework and learning in setup
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
Cites Work
- Optimal pricing and lot-sizing under conditions of perishability, finite production and partial backordering and lost sale
- Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality
- Survey of Literature on Continuously Deteriorating Inventory Models
- Recent trends in modeling of deteriorating inventory
- An EOQ model with ramp type demand rate, time dependent deterioration rate, unit production cost and shortages
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Lot sizing in a production system with rework and product deterioration
- Economic production lot size for deteriorating items taking accout of the time-value of money
- Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
Cited In (14)
- An integrated material flow system approach for determining the economic production quantity (EPQ)
- Lotsizing in a production system with rework and product deterioration
- An EPQ model for an imperfect production system with rework and shortages
- Economic production quantity (EPQ) model for three type imperfect items with rework and learning in setup
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
- A new mathematical model for economic ordering with preventive maintenance and reworking in a supply chain
- A surface response optimization model for EPQ system with imperfect production process under rework and shortage
- Lot sizing in a production system with rework and product deterioration
- Reliability modeling and optimization strategy for manufacturing system based on RQR chain
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Using algebraic approach to solve an EPQ model with rework and service level constraint
- An economic order quantity for deteriorating items with allowable rework of deteriorated products
- Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework
This page was built for publication: An EPQ model for deteriorating production system and items with rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1667059)