A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework
From MaRDI portal
Publication:5891690
DOI10.1080/02522667.2011.10700128zbMath1244.90083OpenAlexW2053780209MaRDI QIDQ5891690
No author found.
Publication date: 8 August 2012
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: http://www.connectjournals.com/file_html_pdf/1269406H_12_JIOS_T117_32-6_pp1417-1423a.pdf
Cites Work
- Unnamed Item
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
- A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem
- The Structure of Periodic Review Policies in the Presence of Random Yield
This page was built for publication: A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework