Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
DOI10.1016/J.CAMWA.2009.10.001zbMATH Open1189.90052OpenAlexW2045325438MaRDI QIDQ980290FDOQ980290
Authors: Yuan-Shyi Peter Chiu, Kuang-Ku Chen, Feng-Tsung Cheng, Mei-Fang Wu
Publication date: 28 June 2010
Published in: Computers & Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2009.10.001
Recommendations
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
- Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown
- Effects of random defective rate and imperfect rework process on economic production quantity model
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
production planningreworkoperations managementbreakdownfinite production rate modelreplenishment run time
Cites Work
- Heuristic genetic algorithms for general capacitated lot-sizing problems
- Inventory management under random supply disruptions and partial backorders
- Foundations of inventory management
- An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging
- A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Production Lot Sizing with Machine Breakdowns
- Analysis of a Production/Inventory System Subject to Random Disruptions
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
- Production-Inventory Systems with Unreliable Machines
- A joint economic-lot-size model for purchaser and vendor in fuzzy sense
- Effects of random defective rate and imperfect rework process on economic production quantity model
- Analysis of a production-inventory system with machine breakdowns and shutdowns
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Joint determination of preventive maintenance and safety stocks in an unreliable production environment
- An EMQ model with inspections and random machine failures
- Approximations to production lot sizing with machine breakdowns.
- Lot size-reorder point inventory model with fuzzy demands
- A dynamic lot sizing model with exponential machine breakdowns
Cited In (29)
- Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation
- Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
- Advertisement policy, reliability dependent imperfect production and environmental pollution control problem in fuzzy-rough environment
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
- Revisiting revenue management for remanufactured products
- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management
- Numerical method for determination of reworking or scraping the defective items in a finite production rate model
- Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
- Imperfect production process with learning and forgetting effects
- A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework
- Research on relationship between economical profit and environmental pollution of imperfect production inventory control problem
- On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
- Analysis of a discrete production workstation
- Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system
- Modeling an inventory problem with random supply, inspection and machine breakdown
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
- Robust planning in optimization for production system subject to random machine breakdown and failure in rework
- Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown
- Controlling defective items in a complex multi-phase manufacturing system
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
- Optimal production run in an imperfect production process with maintenance under warranty and product insurance
- An optimal common production cycle time for imperfect production processes with scrap
- Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure
- Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach
- Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering
- An economic production quantity model with random yield subject to process compressibility
- Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework
This page was built for publication: Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q980290)