An EMQ model with inspections and random machine failures

From MaRDI portal
Publication:3157642

DOI10.1057/palgrave.jors.2600484zbMath1111.90317OpenAlexW2039077431MaRDI QIDQ3157642

No author found.

Publication date: 19 January 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600484




Related Items

Inspection scheduling for imperfect production processes under free repair warranty contractOptimal preventive maintenance for equipment with two quality states and general failure time distributionsModeling an inventory problem with random supply, inspection and machine breakdownSimultaneous determination of production and maintenance schedules using in‐line equipment condition and yield informationProduction lot sizing with process deterioration and machine breakdownOptimal production run length for products sold with warranty in an imperfect production system with allowable shortagesOptimal design of unreliable production--inventory systems with variable production rateOptimization of the finite production rate model with scrap, rework and stochastic machine breakdownSimultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production systemThe effects of inspection delay and restoration cost on the optimal inspection and production policyJoint effect of stock threshold level and production policy on an unreliable production environmentECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIMEOptimal lot sizing for products sold under free-repair warranty.Robust planning in optimization for production system subject to random machine breakdown and failure in reworkECONOMIC PRODUCTION LOT SIZING MODEL WITH STOCHASTIC DEMANDDetermining the optimal production--maintenance policy with inspection errors: Using a Markov chain