Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy

From MaRDI portal
Publication:2419093

DOI10.1007/s41478-018-0089-2zbMath1414.90050OpenAlexW2805918982WikidataQ129718939 ScholiaQ129718939MaRDI QIDQ2419093

T. Sekar, Ramasamy Uthayakumar

Publication date: 29 May 2019

Published in: The Journal of Analysis (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s41478-018-0089-2






Cites Work


This page was built for publication: Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy