Optimal batch production with rework process for products with time-varying demand over finite planning horizon
From MaRDI portal
Publication:4595401
Recommendations
- Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model
- Batching work and rework processes with limited deterioration of reworkables
- Batch scheduling of deteriorating reworkables
- Optimal lot sizing for a production-recovery system with time-varying demand over a finite planning horizon
- Lotsizing in a production system with rework and product deterioration
Cited in
(7)- Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage
- Optimal batch sizing in a multi-stage production system with rework consideration
- On reworks in a serial process with flexible windows of time
- Integrated optimization of production planning and scheduling for fixed-position assembly workshop with rework
- Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy
- A production and repair model under a time-varying demand process
- Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model
This page was built for publication: Optimal batch production with rework process for products with time-varying demand over finite planning horizon
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4595401)