Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model
From MaRDI portal
Publication:2969966
DOI10.1051/RO/2016011zbMATH Open1358.90006OpenAlexW2551951930MaRDI QIDQ2969966FDOQ2969966
Authors: Mohamed Omar, Lakdere Benkherouf
Publication date: 24 March 2017
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/e41c59e7f1924872eae67781dc7acc9306caf2b3
Recommendations
- Optimal batch production with rework process for products with time-varying demand over finite planning horizon
- Optimal lot sizing for a production-recovery system with time-varying demand over a finite planning horizon
- Optimal policies for a finite-horizon batching inventory model
- Optimal batch sizing in a multi-stage production system with rework consideration
- Optimal policies for a finite-horizon production inventory model
Cites Work
- On optimal batch sizing in a multi-stage production system with rework consideration
- Optimal batch sizing in a multi-stage production system with rework consideration
- On a Class of Optimization Problems for Finite Time Horizon Inventory Models
- Optimal policies for a finite-horizon batching inventory model
- Economic ordering policy for an item with imperfect quality subject to the in-house inspection
- Optimal batch ordering over a finite planning horizon
Cited In (2)
This page was built for publication: Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2969966)