Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Integrated optimization of production planning and scheduling for fixed-position assembly workshop with rework

From MaRDI portal
Publication:4574657
Jump to:navigation, search

DOI10.13195/J.KZYJC.2016.1151zbMATH Open1399.90085MaRDI QIDQ4574657FDOQ4574657


Authors: Nanyun Jiang, Hongsen Yan Edit this on Wikidata


Publication date: 18 July 2018





Recommendations

  • Solution strategy of integrated optimization of production planning and scheduling in a flexible job-shop
  • An optimization algorithm for integrated remanufacturing production planning and scheduling system
  • Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm
  • Optimal batch production with rework process for products with time-varying demand over finite planning horizon
  • Optimizing a production system with rework and equal sized batch shipments


zbMATH Keywords

schedulingproduction planningreworkmemetic algorithmintegrated optimizationfixed-position


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)







This page was built for publication: Integrated optimization of production planning and scheduling for fixed-position assembly workshop with rework

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4574657)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4574657&oldid=18716994"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 7 February 2024, at 12:11. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki