Integrated optimization of production planning and scheduling for fixed-position assembly workshop with rework
From MaRDI portal
Publication:4574657
DOI10.13195/J.KZYJC.2016.1151zbMATH Open1399.90085MaRDI QIDQ4574657FDOQ4574657
Authors: Nanyun Jiang, Hongsen Yan
Publication date: 18 July 2018
Recommendations
- Solution strategy of integrated optimization of production planning and scheduling in a flexible job-shop
- An optimization algorithm for integrated remanufacturing production planning and scheduling system
- Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm
- Optimal batch production with rework process for products with time-varying demand over finite planning horizon
- Optimizing a production system with rework and equal sized batch shipments
This page was built for publication: Integrated optimization of production planning and scheduling for fixed-position assembly workshop with rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4574657)