Batch scheduling of deteriorating reworkables
From MaRDI portal
Publication:2482803
DOI10.1016/j.ejor.2006.06.079zbMath1146.90026OpenAlexW2079282558MaRDI QIDQ2482803
Mikhail Y. Kovalyov, Maksim Barketau, Cheng, T. C. Edwin
Publication date: 24 April 2008
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10397/657
Related Items (3)
Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent ⋮ Deteriorating inventory model for chilled food ⋮ Analysis of a discrete production workstation
Cites Work
- Unnamed Item
- Unnamed Item
- Single machine scheduling with release and due date assignment to minimize the weighted number of late jobs
- On the complexity of generalized due date scheduling problems
- Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine
- Single machine scheduling with assignable due dates
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Scheduling with batching: A review
- Recent trends in modeling of deteriorating inventory
This page was built for publication: Batch scheduling of deteriorating reworkables