Analysis of a discrete production workstation
From MaRDI portal
Publication:2669637
Recommendations
Cites work
- A single period production inventory model in interval environment with price revision
- A stochastic production inventory model for deteriorating items with products’ finite life-cycle
- An economic production lot size model in an imperfect production system
- An EPQ model for an imperfect production system with rework and shortages
- An optimal common production cycle time for imperfect production processes with scrap
- Batch scheduling of deteriorating reworkables
- Batching work and rework processes with limited deterioration of reworkables
- Economic lot scheduling problem with imperfect production processes
- Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality
- Economic production quantity (EPQ) models under an imperfect production process with shortages backordered
- EPQ for an unreliable production system with endogenous reliability and product deterioration
- Lot sizing with random yield and different qualities
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
- Multi-product lot-sizing and sequencing on a single imperfect machine
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period
- Optimal production run time and inspection errors in an imperfect production system with warranty
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments
- Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework
- Product inspection policy for an imperfect production system with inspection errors and warranty cost
- Production lot sizing with quality screening and rework
- Scheduling with batching: A review
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- The newsboy problem with resalable returns: a single period model and case study
- The newsvendor problem: review and directions for future research
This page was built for publication: Analysis of a discrete production workstation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2669637)