An optimal common production cycle time for imperfect production processes with scrap
From MaRDI portal
Publication:614296
Recommendations
- Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
- Effects of random defective rate and imperfect rework process on economic production quantity model
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- An economic production quantity model with non-synchronized screening and rework
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Cites work
- scientific article; zbMATH DE number 3188105 (Why is no real title available?)
- A note on 'deliberately slowing down output in a family production context'
- An optimal production run time with imperfect production processes and allowable shortages
- Design of effective inspection schema for imperfect production systems
- Determining a common production cycle time for an economic lot scheduling problem with deteriorating items
- Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality
- Economic lot scheduling problem with imperfect production processes
- Economic lot scheduling problem with imperfect production processes and setup times
- Inspection scheduling for imperfect production processes under free repair warranty contract
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
Cited in
(9)- The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system
- Analysis of a discrete production workstation
- Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions
- Stochastic manufacturing system with process deterioration and machine breakdown
- Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
- Production lot sizing with quality screening and rework
- Inventory model with learning effect and imprecise market demand under screening error
- Modeling an inventory problem with random supply, inspection and machine breakdown
- Sustainable production model with advertisement and market price dependent demand under salvage option for defectives
This page was built for publication: An optimal common production cycle time for imperfect production processes with scrap
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q614296)