An optimal common production cycle time for imperfect production processes with scrap
From MaRDI portal
Publication:614296
DOI10.1016/j.mcm.2010.04.024zbMath1202.90116OpenAlexW2045271788MaRDI QIDQ614296
Gary C. Lin, Wen-Na Ma, Dah-Chuan Gong
Publication date: 27 December 2010
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.mcm.2010.04.024
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (8)
Analysis of a discrete production workstation ⋮ Modeling an inventory problem with random supply, inspection and machine breakdown ⋮ Sustainable production model with advertisement and market price dependent demand under salvage option for defectives ⋮ The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system ⋮ Inventory model with learning effect and imprecise market demand under screening error ⋮ Production lot sizing with quality screening and rework ⋮ Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions ⋮ Stochastic manufacturing system with process deterioration and machine breakdown
Cites Work
- Unnamed Item
- An optimal production run time with imperfect production processes and allowable shortages
- Inspection scheduling for imperfect production processes under free repair warranty contract
- Determining a common production cycle time for an economic lot scheduling problem with deteriorating items
- Economic lot scheduling problem with imperfect production processes
- Design of effective inspection schema for imperfect production systems
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality
- A note on 'deliberately slowing down output in a family production context'
- Economic lot scheduling problem with imperfect production processes and setup times
This page was built for publication: An optimal common production cycle time for imperfect production processes with scrap