Economic lot scheduling problem with imperfect production processes and setup times
From MaRDI portal
Publication:4656665
DOI10.1057/palgrave.jors.2601350zbMath1059.90071MaRDI QIDQ4656665
No author found.
Publication date: 14 March 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601350
capacity constraint; imperfect production processes; economic lot scheduling problem; common cycle approach; time-varying lot sizes approach
Related Items
Agile factorial production for a single manufacturing line with multiple products, An optimal common production cycle time for imperfect production processes with scrap, Learning curves for imperfect production processes with reworks and process restoration interruptions, A genetic algorithm for solving the economic lot scheduling problem in flow shops, Design of effective inspection schema for imperfect production systems