Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions

From MaRDI portal
Publication:4255023

DOI<423::AID-NAV8>3.0.CO;2-7 10.1002/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO;2-7zbMath0941.90027OpenAlexW2050101153MaRDI QIDQ4255023

Mohamed Ben-Daya, Moncer A. Hariga

Publication date: 13 August 2000

Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199806)45:4<423::aid-nav8>3.0.co;2-7




Related Items (26)

The impact of a free-repair warranty policy on EMQ model for imperfect production systemsOptimizing an integrated production and quality strategy considering inspection and preventive maintenance errorsOptimal production and inspection strategy while considering preventive maintenance errors and minimal repairOptimization of maintenance, production and inspection strategies while considering preventative maintenance errorAn optimal common production cycle time for imperfect production processes with scrapThe impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production systemOptimal production run time for two-stage production system with imperfect processes and allowable shortagesOptimal production run time and inspection errors in an imperfect production system with warrantyProduction lot sizing with process deterioration and machine breakdownEconomic production lot-sizing for an unreliable machine under imperfect age-based maintenance policyEconomic optimization for an imperfect process with inspection errors, inspection time and minimal repairAn EMQ model in an imperfect production processOptimization of the finite production rate model with scrap, rework and stochastic machine breakdownSimultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production systemAn integrated inventory model tor supplier and retailer with detective itemsImpact of inspection errors on the lot size problemINTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMESAn optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time lengthOptimal production run time for a deteriorating production system under an extended inspection policyAn economic production lot size model in an imperfect production systemStochastic manufacturing system with process deterioration and machine breakdownRobust planning in optimization for production system subject to random machine breakdown and failure in reworkFast approach to the optimal production/PM policyOptimal inspection and economical production quantity strategy for an imperfect production processCombined production-maintenance decisions in situations with process deteriorationDetermining the optimal production--maintenance policy with inspection errors: Using a Markov chain




This page was built for publication: Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions