Optimal production run time for a deteriorating production system under an extended inspection policy
From MaRDI portal
Publication:1041944
DOI10.1016/j.ejor.2008.05.008zbMath1176.90163OpenAlexW2079725017MaRDI QIDQ1041944
Publication date: 7 December 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.05.008
Related Items
A common cycle approach for solving the economic lot and inspection scheduling problem, Determining the production lot size with a heuristic inspection policy for controlling the quality of input materials and products, Optimal production run time and inspection errors in an imperfect production system with warranty, Incorporating human factors-related performance variation in optimizing a serial system, Determining an optimal production run length with an extended quality control policy for an imperfect process, Economic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristic, Quality Performance Modeling in a Deteriorating Production System with Partially Available Inspection, Utilizing the information theory of entropy to solve an off-line inspection problem
Cites Work
- Optimal production run length for products sold with warranty
- Fast approach to the optimal production/PM policy
- Lot sizing and testing for items with uncertain quality
- Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages
- Optimal lot size and inspection policy for products sold with warranty
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions