A common cycle approach for solving the economic lot and inspection scheduling problem
From MaRDI portal
Publication:2358853
DOI10.3934/jimo.2012.8.141zbMath1364.90033OpenAlexW2065540713MaRDI QIDQ2358853
Ming-Jong Yao, Yu-Jen Chang, Shih-chieh Chen
Publication date: 16 June 2017
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2012.8.141
Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
Related Items
The effects of inspection delay and restoration cost on the optimal inspection and production policy, Attribute-variable Inspection Policy for Lots Using Resampling Based on EWMA
Cites Work
- Unnamed Item
- Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
- Optimal production run time for a deteriorating production system under an extended inspection policy
- A search heuristic for the sequence-dependent economic lot scheduling problem
- Lot sizing and testing for items with uncertain quality
- Inspection scheduling for imperfect production processes under free repair warranty contract
- A profit-maximizing economic lot scheduling problem with price optimization
- Optimal lot size and inspection policy for products sold with warranty
- Hybrid genetic algorithm for group technology economic lot scheduling problem
- Optimal inspection and economical production quantity strategy for an imperfect production process
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System
- The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- A generalized economic model for joint determination of production run, inspection schedule and control chart design
- A basic period approach to the economic lot scheduling problem with shelf life considerations
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system