Optimal production run length for products sold with warranty

From MaRDI portal
Publication:1579493

DOI10.1016/S0377-2217(99)00004-1zbMath0985.90032MaRDI QIDQ1579493

Sheng-Tsaing Tseng, Wen-Tsung Ho, Ruey Huei Yeh

Publication date: 14 September 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (25)

The impact of a free-repair warranty policy on EMQ model for imperfect production systemsInspection scheduling for imperfect production processes under free repair warranty contractAn integrated inventory model with warranty dependent credit period under two policies of a manufacturerOptimal production run in an imperfect production process with maintenance under warranty and product insuranceOptimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction methodDesign of effective inspection schema for imperfect production systemsProduction lot sizing with process deterioration and machine breakdownA Vendor-Buyer Supply Chain Model for Deteriorating Item with Quadratic Time-Varying Demand and Pro-rata Warranty PolicyEffect of warranty and quantity discounts on a deteriorating production system with a Markovian production process and allowable shortagesECONOMIC REPLENISHMENT PLAN WITH IMPERFECT PRODUCTION PROCESS AND BUSINESS-RETURN DEPENDENT DEMANDAn integrated production-inventory deteriorating model for pricing policy considering imperfect production, inspection planning and warranty-period- and stock-level-dependant demandOptimal production run length and warranty period for an imperfect production system under selling price dependent on warranty periodAn optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvementOptimal production run length for products sold with warranty in an imperfect production system with allowable shortagesUtilizing an approximative solution to obtain the real optimal solution for a production and inspection modelJoint determination of production run length and number of standbys in a deteriorating production processOptimal lot size and offline inspection policyECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIMEEconomic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristicOptimal production run time for a deteriorating production system under an extended inspection policyAn economic production lot size model in an imperfect production systemStochastic manufacturing system with process deterioration and machine breakdownApplication of hybrid binary tournament-based quantum-behaved particle swarm optimization on an imperfect production inventory problemRandom maintenance policies for sustaining the reliability of the product through 2D-warrantyCombined production-maintenance decisions in situations with process deterioration



Cites Work




This page was built for publication: Optimal production run length for products sold with warranty