Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
From MaRDI portal
Publication:4015265
DOI10.1287/mnsc.38.9.1314zbMath0758.90040MaRDI QIDQ4015265
Publication date: 12 January 1993
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.38.9.1314
Related Items
Unnamed Item, An optimal batch size for an imperfect production system with quality assurance and rework, Optimizing a production system with rework and equal sized batch shipments, A two-phase ant colony algorithm for multi-echelon defective supply chain network design, Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing, Quality defaults and work-in-process inventory, Composing batches with yield uncertainty, On the probability distribution of total quality under sublot inspection and process restoration, Optimal production run length for products sold with warranty, The economic production lot size model under volume flexibility, The effect of testing errors on a repetitive testing process, Production lot sizing with quality screening and rework, Optimal batch sizing in a multi-stage production system with rework consideration, The effect of testing equipment shift on optimal decisions in a repetitive testing process, Economic lot scheduling with uncontrolled co-production, ECONOMIC PRODUCTION LOT SIZING MODEL WITH STOCHASTIC DEMAND, Integrated on-line and off-line quality control for products with destructive testing, A rework-based dispatching algorithm for module process in TFT-LCD manufacture