A rework-based dispatching algorithm for module process in TFT-LCD manufacture
From MaRDI portal
Publication:3163752
DOI10.1080/00207540802471264zbMATH Open1197.90168OpenAlexW2166929032WikidataQ57441418 ScholiaQ57441418MaRDI QIDQ3163752FDOQ3163752
Authors: H. J. Shin, Yongha Kang
Publication date: 26 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802471264
Recommendations
- Dispatching problems for parallel machines in the TFT‐LCD assembly process
- Modeling the material allocation system for TFT-LCD module factories based on make-to-stock production
- A dispatching algorithm for parallel machines with rework processes
- Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time
- A hybrid dynamic pre-emptive and competitive neural-network approach in solving the multi-objective dispatching problem for TFT-LCD manufacturing
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
- An optimised dynamic bottleneck dispatching policy for semiconductor wafer fabrication
- A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system
- A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing
- A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups
Cites Work
- An optimal batch size for an imperfect production system with quality assurance and rework
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Lot sizing in a production system with rework and product deterioration
- Scheduling jobs on parallel machines with sequence-dependent setup times
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- A multi-phase model for product part change problems
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
- The impact of defects on a process with rework
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
Cited In (6)
- An adaptive scheduling algorithm for a parallel machine problem with rework processes
- Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time
- Dispatching problems for parallel machines in the TFT‐LCD assembly process
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
- Two-phased meta-heuristic methods for the post-mapping yield control problem
- Modeling the material allocation system for TFT-LCD module factories based on make-to-stock production
This page was built for publication: A rework-based dispatching algorithm for module process in TFT-LCD manufacture
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3163752)