Lot sizing in a production system with rework and product deterioration

From MaRDI portal
Publication:5466721

DOI10.1080/0020754042000298539zbMath1068.90047OpenAlexW4235123590MaRDI QIDQ5466721

Nikolaos Panagiotis Rachaniotis, Gerd Lindner, Karl Inderfurth

Publication date: 25 August 2005

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/0020754042000298539




Related Items (18)

Exploring the effect of the first cycle on the economic production quantity repair and waste disposal modelA rework-based dispatching algorithm for module process in TFT-LCD manufactureIntegrating deterioration and lifetime constraints in production and supply chain planning: a surveyAn EPQ model for deteriorating production system and items with reworkAn evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systemsA fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditionsAn optimal returned policy for a reverse logistics inventory model with backordersA stochastic production inventory model for deteriorating items with products’ finite life-cycleScheduling in a multi-processor environment with deteriorating job processing times and decreasing values: the case of forest firesEconomic production quantity model for deteriorating inventory with random machine unavailability and shortageThe economic order quantity repair and waste disposal model with entropy costDisposal versus rework -- inventory control in a production system with random yieldScheduling a single fire fighting resource with deteriorating fire suppression times and set-up timesOptimal replenishment quantity for new products and return rate of used products for a retailerProduction lot sizing with quality screening and reworkOptimal policy for a closed-loop supply chain inventory system with remanufacturingEconomic production quantity with imperfect production processes and learning effectsLot sizing for a single product recovery system with variable setup numbers



Cites Work




This page was built for publication: Lot sizing in a production system with rework and product deterioration