Lot sizing in a production system with rework and product deterioration
From MaRDI portal
Publication:5466721
DOI10.1080/0020754042000298539zbMath1068.90047OpenAlexW4235123590MaRDI QIDQ5466721
Nikolaos Panagiotis Rachaniotis, Gerd Lindner, Karl Inderfurth
Publication date: 25 August 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0020754042000298539
Related Items (18)
Exploring the effect of the first cycle on the economic production quantity repair and waste disposal model ⋮ A rework-based dispatching algorithm for module process in TFT-LCD manufacture ⋮ Integrating deterioration and lifetime constraints in production and supply chain planning: a survey ⋮ An EPQ model for deteriorating production system and items with rework ⋮ An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems ⋮ A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions ⋮ An optimal returned policy for a reverse logistics inventory model with backorders ⋮ A stochastic production inventory model for deteriorating items with products’ finite life-cycle ⋮ Scheduling in a multi-processor environment with deteriorating job processing times and decreasing values: the case of forest fires ⋮ Economic production quantity model for deteriorating inventory with random machine unavailability and shortage ⋮ The economic order quantity repair and waste disposal model with entropy cost ⋮ Disposal versus rework -- inventory control in a production system with random yield ⋮ Scheduling a single fire fighting resource with deteriorating fire suppression times and set-up times ⋮ Optimal replenishment quantity for new products and return rate of used products for a retailer ⋮ Production lot sizing with quality screening and rework ⋮ Optimal policy for a closed-loop supply chain inventory system with remanufacturing ⋮ Economic production quantity with imperfect production processes and learning effects ⋮ Lot sizing for a single product recovery system with variable setup numbers
Cites Work
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- The EOQ repair and waste disposal model with variable setup numbers
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Determining a threshold control policy for an imperfect production system with rework jobs
- Lot Sizing with Random Yields: A Review
- Recent trends in modeling of deteriorating inventory
This page was built for publication: Lot sizing in a production system with rework and product deterioration