Combined production-maintenance decisions in situations with process deterioration
From MaRDI portal
Publication:2872642
DOI10.1080/00207721.2012.669865zbMath1280.90080OpenAlexW2050785556MaRDI QIDQ2872642
Publication date: 15 January 2014
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207721.2012.669865
Management decision making, including multiple objectives (90B50) Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)
Related Items (1)
Cites Work
- Unnamed Item
- A production policy considering reworking of imperfect items and trade credit
- An economic production lot size model in an imperfect production system
- Optimal production run length for products sold with warranty
- Optimal lot sizing for products sold under free-repair warranty.
- Production lot sizing with process deterioration and machine breakdown
- Machine scheduling with an availability constraint
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
- Joint pricing and replenishment decisions for deteriorating items with lot-size and time-dependent purchasing cost under credit period
- Collaborative pricing and replenishment policy for hi-tech industry
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system
This page was built for publication: Combined production-maintenance decisions in situations with process deterioration