scientific article; zbMATH DE number 1156571
From MaRDI portal
Publication:4390595
Recommendations
- Fast approach to the optimal production/PM policy
- OPTIMAL INSPECTION SCHEDULE IN AN IMPERFECT EMQ MODEL WITH FREE REPAIR WARRANTY POLICY(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
- An EMQ model with inspections and random machine failures
- Impact of inspection errors on the lot size problem
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
Cited in
(35)- Optimal production run time for a deteriorating production system under an extended inspection policy
- An economic production lot size model in an imperfect production system
- On the probability distribution of total quality under sublot inspection and process restoration
- Fast approach to the optimal production/PM policy
- Joint effect of stock threshold level and production policy on an unreliable production environment
- Optimal lot sizing for products sold under free-repair warranty.
- Determining the optimal production--maintenance policy with inspection errors: Using a Markov chain
- An optimal production run time with imperfect production processes and allowable shortages
- The impact of a free-repair warranty policy on EMQ model for imperfect production systems
- Effect of warranty and quantity discounts on a deteriorating production system with a Markovian production process and allowable shortages
- Inspection scheduling for imperfect production processes under free repair warranty contract
- Production lot sizing with process deterioration and machine breakdown
- Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages
- Combined production-maintenance decisions in situations with process deterioration
- Economic production quantity model with continuous quality inspection
- An EMQ model with inspections and random machine failures
- Optimal production run length and capital investment in quality improvement with an imperfect production process
- An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand
- Production to order and off-line inspection when the production process is partially observable
- The optimal production and quality policy for the vendor in a trade
- ECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIME
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
- Impact of inspection errors on the lot size problem
- Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
- A recursive approach for lot sentencing problem in the presence of inspection errors
- An optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvement
- OPTIMAL INSPECTION SCHEDULE IN AN IMPERFECT EMQ MODEL WITH FREE REPAIR WARRANTY POLICY(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
- Stochastic manufacturing system with process deterioration and machine breakdown
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system
- Optimal inspection policies for a scale
- The effects of inspection delay and restoration cost on the optimal inspection and production policy
- An EPQ model with setup cost and process quality as functions of capital expenditure
- Optimal lot size and offline inspection policy
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4390595)