Optimal production run time for two-stage production system with imperfect processes and allowable shortages
From MaRDI portal
Publication:441026
DOI10.1007/S10100-010-0143-XzbMath1245.90025OpenAlexW1990116489MaRDI QIDQ441026
Wen Lea Pearn, Ming-Wei Weng, Chang-Hsien Hsu, Rung-Hung Su
Publication date: 20 August 2012
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-010-0143-x
Related Items (4)
Innovative maintenance problem in a two-stage production-inventory system with imperfect processes ⋮ Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period ⋮ A note on ``Production lot sizing with quality screening and rework ⋮ Interdependent demand in the two-period newsvendor problem
Cites Work
- Unnamed Item
- Unnamed Item
- Analysis of a production-inventory system with machine breakdowns and shutdowns
- An optimal production run time with imperfect production processes and allowable shortages
- Joint investment in quality improvement and setup reduction
- Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
- Optimal batch sizing in a multi-stage production system with rework consideration
- Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages
- Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Production Lot Sizing with Machine Breakdowns
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
This page was built for publication: Optimal production run time for two-stage production system with imperfect processes and allowable shortages