Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process

From MaRDI portal
Publication:1941952

DOI10.1016/S0305-0548(01)00051-XzbMath1259.90005MaRDI QIDQ1941952

Cheng-Kang Chen, Hung-Chi Chang, Liang-Yuh Ouyang

Publication date: 25 March 2013

Published in: Computers \& Operations Research (Search for Journal in Brave)




Related Items (27)

Optimal economic production quantity policy for imperfect process with imperfect repair and maintenanceComputational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllableDistribution-free approach for stochastic joint-replenishment problem with backorders-lost sales mixtures, and controllable major ordering cost and lead timesJust-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investmentEffect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain modelOptimal production correction and maintenance policy for imperfect processProduction lead-time hedging and order allocation in an MTO supply chainSustainable inventory management with hybrid production system and investment to reduce defectsOptimal production run time for two-stage production system with imperfect processes and allowable shortagesLost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production systemDistribution-free continuous review inventory model with controllable lead time and setup cost in the presence of a service level constraintAn integrated inventory model for a deteriorating item with allowable shortages and credit linked wholesale priceAn integrated inventory model with ordering cost and setup cost reductions under just-in-time purchasingA deterministic, multi-item inventory model with supplier selection and imperfect qualityProduction decision making considering dual material types and setup time uncertaintySupply chain model with stochastic lead time, trade-credit financing, and transportation discountsInventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investmentA single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying itemsA joint inventory model with reliability, carbon emission, and inspection errors in a defective production systemTHE SINGLE-VENDOR SINGLE-BUYER INTEGRATED INVENTORY PROBLEM WITH QUALITY IMPROVEMENT AND LEAD TIME REDUCTION — MINIMAX DISTRIBUTION-FREE APPROACHOptimal inventory policy involving ordering cost reduction, back-order discounts, and variable lead time demand by minimax criterionUnnamed ItemInfluence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain managementImprovement of Quality with the Reduction of Order Processing Cost by Just-In-Time PurchasingOptimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenanceA stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributionsShortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction



Cites Work


This page was built for publication: Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process