A joint inventory model with reliability, carbon emission, and inspection errors in a defective production system
DOI10.2298/YJOR190415020SzbMath1474.90028OpenAlexW3038841669MaRDI QIDQ3388834
Biswajit Sarkar, Bijoy Kumar Shaw, Isha Sangal, Rekha Guchhait
Publication date: 7 May 2021
Published in: Yugoslav Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2298/yjor190415020s
Management decision making, including multiple objectives (90B50) Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05) Environmental economics (natural resource models, harvesting, pollution, etc.) (91B76)
Related Items (1)
Cites Work
- Unnamed Item
- Integrated vendor-buyer supply chain model with Vendor's setup cost reduction
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- Supply chain integrated inventory model with present value and dependent crashing cost is polynomial
- Optimal reliability, production lot size and safety stock in an imperfect production system
- Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system
- The single-vendor single-buyer integrated production-inventory model with a generalised policy
- Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model
- Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
- An integrated inventory model with variable transportation cost, two-stage inspection, and defective items
- Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model
- An EOQ model for deteriorating items with time varying demand and partial backlogging
- Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management
- Periodic review fuzzy inventory model with variable lead time and fuzzy demand
- Vendor-Buyers relationship model for deteriorating items with shortages, fuzzy trapezoidal costs and inflation
This page was built for publication: A joint inventory model with reliability, carbon emission, and inspection errors in a defective production system