Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management
DOI10.1051/ro/2018041zbMath1425.90004OpenAlexW2805723483WikidataQ129734554 ScholiaQ129734554MaRDI QIDQ5244314
Biswajit Sarkar, Mitali Sarkar, Baishakhi Ganguly, Sarla Pareek, Muhammad Omair
Publication date: 20 November 2019
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2018041
supply chain managementStackelberg gametransportation costunequal shipment sizecarbon emission costdiscrete setup cost reduction
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Related Items (1)
Cites Work
- Integrated vendor-buyer supply chain model with Vendor's setup cost reduction
- Product inspection policy for an imperfect production system with inspection errors and warranty cost
- An optimal shipment strategy for imperfect items in a stock-out situation
- The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives
- Optimal production and shipment models for a single-vendor--single-buyer integrated system
- Controlling setup cost in \((Q, r, L)\) inventory model with defective items
- Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model
- A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff
- Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products
- Efficient lot-sizing under differential transportation cost structure for serially distributed warehouses
- An integrated multi-lot-size production inventory model for deteriorating item
- Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
- An integrated inventory model with variable transportation cost, two-stage inspection, and defective items
- The uncertain premium principle based on the distortion function
- Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction
- Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Periodic review fuzzy inventory model with variable lead time and fuzzy demand
This page was built for publication: Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management