Optimal reliability, production lot size and safety stock in an imperfect production system
From MaRDI portal
(Redirected from Publication:991876)
Recommendations
- Joint determination of optimal safety stocks and production policy for an imperfect production system
- An EMQ model in an imperfect production process
- Production lot sizing with process deterioration and machine breakdown
- A production-inventory model in an imperfect production process
- Optimal design of unreliable production--inventory systems with variable production rate
Cited in
(22)- An integrated inventory model with variable lead time, defective units and delay in payments
- An inventory model with reliability in an imperfect production process
- An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
- Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system
- An EMQ model with price and time dependent demand under the effect of reliability and inflation
- Allocation of redundancies in systems: a general dependency-base framework
- Product inspection policy for an imperfect production system with inspection errors and warranty cost
- scientific article; zbMATH DE number 5631703 (Why is no real title available?)
- Joint determination of optimal safety stocks and production policy for an imperfect production system
- A robust fuzzy approach for constrained multi-product economic production quantity with imperfect items and rework process
- An economic production quantity model for defective items with trapezoidal type demand rate
- Three-layer supply chain - A production-inventory model for reworkable items
- Multi-item imperfect production inventory model in bi-fuzzy environments
- Imperfection with inspection policy and variable demand under trade-credit: a deteriorating inventory model
- A joint inventory model with reliability, carbon emission, and inspection errors in a defective production system
- Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions
- Optimal lot sizing in an unreliable two-stage serial production-inventory system
- Economic lot sizing for unreliable production system with shortages
- An EPL model with reliability-dependent randomly imperfect production system over different uncertain finite time horizons
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering
- EPL models for complementary and substitute items under imperfect production process with promotional cost and selling price dependent demands
This page was built for publication: Optimal reliability, production lot size and safety stock in an imperfect production system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q991876)