An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length

From MaRDI portal
Publication:3644979

DOI10.1080/00207720902974645zbMath1175.93248OpenAlexW2091176735MaRDI QIDQ3644979

Jen-Ming Chen, PeCheng Wang, Ya-Hui Lin, Yan-Chun Chen

Publication date: 16 November 2009

Published in: International Journal of Systems Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207720902974645




Related Items (5)




Cites Work




This page was built for publication: An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length