Publication | Date of Publication | Type |
---|
Approximation algorithms for batch scheduling with processing set restrictions | 2024-04-02 | Paper |
A branch‐and‐price‐and‐cut algorithm for the truck‐drone routing problem with simultaneously delivery and pickup | 2024-03-06 | Paper |
Revenue sharing or not? Coordination of the buy‐online‐and‐pickup‐in‐store supply chain | 2024-01-31 | Paper |
Properly colored cycles in edge-colored 2-colored-triangle-free complete graphs | 2024-01-09 | Paper |
Information sharing and coordination in a vaccine supply chain | 2023-11-16 | Paper |
Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work | 2023-10-25 | Paper |
An exact solution method for home health care scheduling with synchronized services | 2023-10-18 | Paper |
Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work | 2023-10-18 | Paper |
Operations strategies with snobbish and strategic consumers | 2023-10-17 | Paper |
Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work | 2023-10-17 | Paper |
Two‐agent scheduling with linear resource‐dependent processing times | 2023-10-12 | Paper |
Purchase and retrieval competition for seasonal produce | 2023-10-09 | Paper |
Properly colored even cycles in edge-colored complete balanced bipartite graphs | 2023-10-07 | Paper |
Stochastic production capacity: A bane or a boon for quick response supply chains? | 2023-10-05 | Paper |
Pricing, coalition stability, and profit allocation in the pull assembly supply chains under competition | 2023-09-15 | Paper |
Production lead-time hedging and order allocation in an MTO supply chain | 2023-09-15 | Paper |
Sufficient conditions for $k$-factors and spanning trees of graphs | 2023-08-26 | Paper |
Purchase or rent? Optimal pricing for 3D printing capacity sharing platforms | 2023-07-10 | Paper |
Single-machine scheduling with autonomous and induced learning to minimize total weighted number of tardy jobs | 2023-07-10 | Paper |
A branch-and-price-and-cut algorithm for the truck-based drone delivery routing problem with time windows | 2023-07-10 | Paper |
Robust optimization for the electric vehicle pickup and delivery problem with time windows and uncertain demands | 2023-07-04 | Paper |
Wasserstein distributionally robust chance-constrained program with moment information | 2023-07-04 | Paper |
Impacts of the minimum quantity contract on an online retail platform | 2023-07-03 | Paper |
Entry game in supply chains with yield uncertainty | 2023-03-29 | Paper |
Analysis of upstream pricing regulation and contract structure in an agriculture supply chain | 2023-01-23 | Paper |
Optimal selection of supply chain financing programmes for a financially distressed manufacturer | 2022-12-19 | Paper |
Distributionally robust multi-period location-allocation with multiple resources and capacity levels in humanitarian logistics | 2022-12-12 | Paper |
An online algorithm for the inventory retrieval problem with an uncertain selling duration, uncertain prices, and price-dependent demands | 2022-09-27 | Paper |
Single-machine multitasking scheduling with job efficiency promotion | 2022-08-26 | Paper |
Multi-period green reverse logistics network design: an improved Benders-decomposition-based heuristic approach | 2022-07-22 | Paper |
On the 3-color Ramsey numbers \(R(C_4,C_4,W_n)\) | 2022-06-01 | Paper |
Which strategy is better for managing multi-product demand uncertainty: inventory substitution or probabilistic selling? | 2022-05-20 | Paper |
Cooperative Promotion of Cross-Market Firms Adopting 3D Printing Technology | 2022-04-08 | Paper |
Lead-time quotation and hedging coordination in make-to-order supply chain | 2022-03-18 | Paper |
Joint optimization of order sequencing and rack scheduling in the robotic mobile fulfilment system | 2022-03-09 | Paper |
Bounds for two multicolor Ramsey numbers concerning quadrilaterals | 2022-03-03 | Paper |
Production/inventory competition between firms with fixed-proportions co-production systems | 2022-02-23 | Paper |
Two-agent integrated scheduling of production and distribution operations with fixed departure times | 2022-02-16 | Paper |
Parallel-machine scheduling in shared manufacturing | 2022-02-16 | Paper |
Four decades of research on the open-shop scheduling problem to minimize the makespan | 2021-11-05 | Paper |
A Branch-and-Price-and-Cut Algorithm for the Cable-Routing Problem in Solar Power Plants | 2021-06-23 | Paper |
A meta-heuristic to solve the just-in-time job-shop scheduling problem | 2021-06-03 | Paper |
Optimal bi-criterion planning of rescue and evacuation operations for marine accidents using an iterative scheduling algorithm | 2021-05-05 | Paper |
Single-machine serial-batch delivery scheduling with two competing agents and due date assignment | 2021-05-05 | Paper |
Degree sums and dominating cycles | 2021-01-27 | Paper |
Due date-related scheduling with two agents. Models and algorithms | 2020-03-02 | Paper |
The single-item lot-sizing problem with two production modes, inventory bounds, and periodic carbon emissions capacity | 2020-02-10 | Paper |
Coupled task scheduling with exact delays: literature review and models | 2020-01-08 | Paper |
A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times | 2019-12-03 | Paper |
Optimal online algorithms for MapReduce scheduling on two uniform machines | 2019-10-18 | Paper |
Optimal production-inventory policy for the multi-period fixed proportions co-production system | 2019-09-18 | Paper |
An exact branch‐and‐price algorithm for multitasking scheduling on unrelated parallel machines | 2019-09-17 | Paper |
Server scheduling on parallel dedicated machines with fixed job sequences | 2019-08-12 | Paper |
Efficient Multi-Attribute Auctions Considering Supply Disruption | 2019-07-05 | Paper |
Selling to strategic and loss‐averse consumers: Stocking, procurement, and product design policies | 2019-05-02 | Paper |
Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work | 2019-05-02 | Paper |
CON/SLK due date assignment and scheduling on a single machine with two agents | 2019-05-02 | Paper |
A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times | 2019-05-02 | Paper |
Preemptive parallel‐machine scheduling with a common server to minimize makespan | 2019-05-02 | Paper |
Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents | 2019-03-01 | Paper |
Which inspection approach is better to prevent drug fraud: announced or unannounced? | 2019-01-15 | Paper |
A periodic collaboration and coexistence management model with the oscillation effect for complex mega infrastructure project under the risk of infection | 2018-12-17 | Paper |
Integrated production and multiple trips vehicle routing with time windows and uncertain travel times | 2018-12-17 | Paper |
On three color Ramsey numbers \(R(C_4, C_4, K_{1, n})\) | 2018-11-29 | Paper |
Re-entrant flowshop scheduling with learning considerations to minimize the makespan | 2018-10-05 | Paper |
Advances in stochastic programming and robust optimization for supply chain planning | 2018-09-18 | Paper |
Why and how do branders sell new products on flash sale platforms? | 2018-05-31 | Paper |
Supply option contracts with spot market and demand information updating | 2018-05-30 | Paper |
Buy online and pick up in-store: design of the service area | 2018-05-30 | Paper |
Bin packing game with a price of anarchy of \(\frac{3}{2}\) | 2018-03-01 | Paper |
Mean-risk analysis of wholesale price contracts with stochastic price-dependent demand | 2018-02-16 | Paper |
Optimal Policy for Inventory Transfer Between Two Depots With Backlogging | 2017-09-08 | Paper |
Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs | 2017-08-25 | Paper |
Production and Inventory Rationing in a Make-to-Stock System With a Failure-Prone Machine and Lost Sales | 2017-08-25 | Paper |
Optimal Scheduling of a Single-Supplier Single-Manufacturer Supply Chain With Common due Windows | 2017-08-25 | Paper |
A note on the subtree ordered median problem in networks based on nestedness property | 2017-06-16 | Paper |
Talent hold cost minimization in film production | 2017-06-15 | Paper |
Some values of Ramsey numbers for \(C_4\) versus stars | 2017-05-24 | Paper |
Polarity graphs and Ramsey numbers for \(C_4\) versus stars | 2017-02-06 | Paper |
Hybridization of tabu search with feasible and infeasible local searches for the quadratic multiple knapsack problem | 2016-11-17 | Paper |
Two-agent singe-machine scheduling with release times to minimize the total weighted completion time | 2016-11-11 | Paper |
A tabu search/path relinking algorithm to solve the job shop scheduling problem | 2016-11-10 | Paper |
Greening and performance relativity: an application in the shipping industry | 2016-11-10 | Paper |
Iterated local search based on multi-type perturbation for single-machine earliness/tardiness scheduling | 2016-11-10 | Paper |
A hybrid evolutionary algorithm to solve the job shop scheduling problem | 2016-10-11 | Paper |
A mean-shift algorithm for large-scale planar maximal covering location problems | 2016-10-07 | Paper |
Two-agent scheduling in a flowshop | 2016-10-07 | Paper |
Rescheduling on identical parallel machines with machine disruptions to minimize total completion time | 2016-10-07 | Paper |
Competitive ratios for preemptive and non-preemptive online scheduling with nondecreasing concave machine cost | 2016-07-08 | Paper |
Buyback contracts with price-dependent demands: effects of demand uncertainty | 2016-06-27 | Paper |
Product variety and channel structure strategy for a retailer-Stackelberg supply chain | 2016-06-24 | Paper |
Make-or-buy service capacity decision in a supply chain providing after-sales service | 2016-06-24 | Paper |
Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns | 2016-06-23 | Paper |
The complexity of scheduling starting time dependent tasks with release times | 2016-06-09 | Paper |
Single‐machine common flow allowance scheduling with aging effect, resource allocation, and a rate‐modifying activity | 2016-02-09 | Paper |
Four single-machine scheduling problems involving due date determination decisions | 2015-09-24 | Paper |
Quality uncertainty and quality-compensation contract for supply chain coordination | 2015-07-28 | Paper |
Coordination of supply chains with bidirectional option contracts | 2015-07-28 | Paper |
Inefficiency of the Nash equilibrium for selfish machine covering on two hierarchical uniform machines | 2015-07-15 | Paper |
Single-machine batch scheduling of linear deteriorating jobs | 2015-05-18 | Paper |
Extreme tenacity of graphs with given order and size | 2015-01-27 | Paper |
Single-machine scheduling with accelerating learning effects | 2014-11-24 | Paper |
Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness | 2014-08-18 | Paper |
Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position | 2014-08-01 | Paper |
Two-agent single-machine scheduling with assignable due dates | 2014-07-04 | Paper |
The planar Ramsey number \(\mathrm{PR}(C_4,K_8)\) | 2014-05-06 | Paper |
Single-machine scheduling with accelerating deterioration effects | 2014-04-30 | Paper |
https://portal.mardi4nfdi.de/entity/Q5411271 | 2014-04-23 | Paper |
Optimal algorithms for semi-online machine covering on two hierarchical machines | 2014-03-28 | Paper |
Scheduling with a position-weighted learning effect | 2014-03-14 | Paper |
Single-machine scheduling and due date assignment with rejection and position-dependent processing times | 2014-03-11 | Paper |
Bounded parallel-batching scheduling with two competing agents | 2014-02-05 | Paper |
Single-machine scheduling with past-sequence-dependent delivery times and a linear deterioration | 2013-11-14 | Paper |
Generalized Levitin-Polyak Well-Posedness for Generalized Semi-Infinite Programs | 2013-07-30 | Paper |
https://portal.mardi4nfdi.de/entity/Q5299402 | 2013-06-25 | Paper |
Single-machine common due window assignment and scheduling to minimize the total cost | 2013-03-13 | Paper |
Minimizing makespan in a two-machine flow shop with effects of deterioration and learning | 2012-12-11 | Paper |
Resource-constrained flowshop scheduling with separate resource recycling operations | 2012-11-15 | Paper |
A self-guided genetic algorithm for permutation flowshop scheduling problems | 2012-11-15 | Paper |
Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities | 2012-11-15 | Paper |
Algorithms better than LPT for semi-online scheduling with decreasing processing times | 2012-11-08 | Paper |
Several semi-online scheduling problems on two identical machines with combined information | 2012-10-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q2917206 | 2012-09-27 | Paper |
Optimal order lot sizing and pricing with free shipping | 2012-08-16 | Paper |
Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time | 2012-07-13 | Paper |
Polynomial-time approximation scheme for concurrent open shop scheduling with a fixed number of machines to minimize the total weighted completion time | 2012-06-18 | Paper |
Scheduling a single server in a two-machine flow shop | 2012-06-04 | Paper |
An Erratum on the Multiproduct Network Equilibrium Model | 2012-03-26 | Paper |
Scheduling with job-dependent learning effects and multiple rate-modifying activities | 2012-01-18 | Paper |
A vector network equilibrium problem with a unilateral constraint | 2011-12-28 | Paper |
A closed-form solution for the optimal release times for the \(F2|\) deteriorating jobs \(|\sum w_{j}c_{j}\) problem | 2011-08-10 | Paper |
Coordinating a two-supplier and one-retailer supply chain with forecast updating | 2011-08-01 | Paper |
Semi-online scheduling with known partial information about job sizes on two identical machines | 2011-07-14 | Paper |
Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness | 2011-06-30 | Paper |
Batch Scheduling of Deteriorating Products | 2011-06-28 | Paper |
Two-agent scheduling with position-based deteriorating jobs and learning effects | 2011-06-24 | Paper |
Nonlinear augmented Lagrangian for nonconvex multiobjective optimization | 2011-06-10 | Paper |
Scheduling with centralized and decentralized batching policies in concurrent open shops | 2011-04-29 | Paper |
An FPTAS for a supply scheduling problem with non-monotone cost functions | 2011-04-28 | Paper |
Coordination of supply chains by option contracts: a cooperative game theory approach | 2010-09-09 | Paper |
https://portal.mardi4nfdi.de/entity/Q3575421 | 2010-07-27 | Paper |
An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespan | 2010-06-09 | Paper |
Vector equilibrium flows with nonconvex ordering relations | 2010-04-28 | Paper |
Absorbant of generalized de Bruijn digraphs | 2010-03-24 | Paper |
Classical duality and existence results for a multi-criteria supply-demand network equilibrium model | 2010-03-22 | Paper |
Two-machine flow shop scheduling with common due window to minimize weighted number of early and tardy jobs | 2010-03-22 | Paper |
Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance | 2010-03-19 | Paper |
Price and lead time decisions in dual-channel supply chains | 2010-03-18 | Paper |
An FPTAS for scheduling jobs with piecewise linear decreasing processing times to minimize makespan | 2010-01-29 | Paper |
Machine scheduling with job class setup and delivery considerations | 2010-01-15 | Paper |
The Ramsey numbers for cycles versus wheels of even order | 2009-12-01 | Paper |
THE RAMSEY NUMBERS FOR STARS OF ODD ORDER VERSUS A WHEEL OF ORDER NINE | 2009-11-19 | Paper |
Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan | 2009-11-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q3183651 | 2009-10-20 | Paper |
Parallel-machine scheduling of simple linear deteriorating jobs | 2009-09-10 | Paper |
Single-machine scheduling with trade-off between number of tardy jobs and compression cost | 2009-08-28 | Paper |
A Multiproduct, Multicriterion Supply-Demand Network Equilibrium Model | 2009-08-13 | Paper |
\(\frac{3}{2}\)-approximation for two-machine no-wait flowshop scheduling with availability constraints | 2009-07-09 | Paper |
Upper bounds on the upper signed total domination number of graphs | 2009-06-30 | Paper |
Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times | 2009-06-18 | Paper |
Extreme values of the sum of squares of degrees of bipartite graphs | 2009-06-17 | Paper |
Bounded single-machine parallel-batch scheduling with release dates and rejection | 2009-05-19 | Paper |
Johnson's rule, composite jobs and the relocation problem | 2009-04-08 | Paper |
Some New Structural Properties of Shortest 2-Connected Steiner Networks | 2009-03-10 | Paper |
A polynomial-time algorithm for the paired-domination problem on permutation graphs | 2009-03-04 | Paper |
The Ramsey number for a cycle of length six versus a clique of order eight | 2009-03-04 | Paper |
Clique-Transversal Sets in Cubic Graphs | 2009-03-03 | Paper |
The structural theory of general systems applied in management: the total relationship flow management theorems | 2009-02-18 | Paper |
Production scheduling with supply and delivery considerations to minimize the makespan | 2008-12-05 | Paper |
An analytical study of the modification ability of distribution centers | 2008-12-05 | Paper |
A hybrid algorithm for the single-machine total tardiness problem | 2008-11-07 | Paper |
An application of the Turán theorem to domination in graphs | 2008-10-17 | Paper |
Bounds on the clique-transversal number of regular graphs | 2008-09-09 | Paper |
Heavy cycles in \(k\)-connected weighted graphs with large weighted degree sums | 2008-09-04 | Paper |
Remarks on the minus (signed) total domination in graphs | 2008-07-11 | Paper |
The Ramsey numbers \(R(C_m,K_7)\) and \(R(C_7,K_8)\) | 2008-05-29 | Paper |
Batch scheduling of deteriorating reworkables | 2008-04-24 | Paper |
Parallel-machine scheduling with simple linear deterioration to minimize total completion time | 2008-02-13 | Paper |
Two-machine open shop problem with controllable processing times | 2008-01-18 | Paper |
Minimizing total completion time subject to job release dates and preemption penalties | 2007-12-20 | Paper |
Henig efficiency of a multi-criterion supply-demand network equilibrium model | 2007-10-31 | Paper |
The algorithmic complexity of the minus clique-transversal problem | 2007-09-19 | Paper |
An Implicit Weighted Degree Condition for Heavy Cycles in Weighted Graphs | 2007-08-28 | Paper |
Machine scheduling with an availability constraint and job delivery coordination | 2007-05-23 | Paper |
SCHEDULING PROBLEMS WITH THE EFFECTS OF DETERIORATION AND LEARNING | 2007-05-21 | Paper |
An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraint | 2007-04-26 | Paper |
Application of structural equation modeling to evaluate the intention of shippers to use internet services in liner shipping | 2007-03-08 | Paper |
A simple linear time algorithm for scheduling with step-improving processing times | 2007-02-26 | Paper |
Single-machine scheduling with periodic maintenance to minimize makespan | 2007-01-09 | Paper |
Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan | 2006-12-14 | Paper |
Minimizing total completion time in a two-machine flow shop with deteriorating jobs | 2006-11-15 | Paper |
Heuristics for two-machine flowshop scheduling with setup times and an availability constraint | 2006-11-15 | Paper |
Batch delivery scheduling with batch delivery cost on a single machine | 2006-11-15 | Paper |
Scheduling with controllable release dates and processing times: Makespan minimization | 2006-10-27 | Paper |
Scheduling with controllable release dates and processing times: total completion time minimization | 2006-10-27 | Paper |
Scheduling linear deteriorating jobs with an availability constraint on a single machine | 2006-10-20 | Paper |
Two‐machine flowshop scheduling with conditional deteriorating second operations | 2006-09-14 | Paper |
A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups | 2006-06-30 | Paper |
The impact of information sharing in a two-level supply chain with multiple retailers | 2006-02-21 | Paper |
Scheduling with step-improving processing times | 2006-01-18 | Paper |
Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine | 2005-12-29 | Paper |
Semi-on-line multiprocessor scheduling with given total processing time | 2005-06-30 | Paper |
Two-machine flowshop scheduling with job class setups to minimize total flowtime | 2005-06-27 | Paper |
Batch scheduling with controllable setup and processing times to minimize total completion time | 2005-06-21 | Paper |
Convergence results for weak efficiency in vector optimization problems with equilibrium constraints | 2005-06-13 | Paper |
Single machine scheduling with a restricted rate-modifying activity | 2005-06-01 | Paper |
Two-machine flowshop batching and scheduling | 2005-04-22 | Paper |
Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem | 2005-04-21 | Paper |
An approximation algorithm for parallel machine scheduling with a common server | 2005-03-16 | Paper |
https://portal.mardi4nfdi.de/entity/Q4656644 | 2005-03-14 | Paper |
Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times | 2005-02-09 | Paper |
A note on scheduling alternative operations in two-machine flowshops | 2005-01-19 | Paper |
Optimal production stopping and restarting times for an EOQ model with deteriorating items | 2005-01-19 | Paper |
Single machine scheduling with resource dependent release times and processing times | 2005-01-12 | Paper |
Lower bounds and semi on-line multiprocessor scheduling | 2004-10-28 | Paper |
A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times | 2004-08-16 | Paper |
Paired-domination in inflated graphs | 2004-08-10 | Paper |
Complexity results for flow-shop and open-shop scheduling problems with transportation delays | 2004-08-10 | Paper |
Scheduling jobs with piecewise linear decreasing processing times | 2004-03-15 | Paper |
A strategic model for supply chain design with logical constraints: Formulation and solution. | 2004-02-14 | Paper |
Single machine batch scheduling with jointly compressible setup and processing times. | 2004-01-05 | Paper |
Approximability of two-machine no-wait flowshop scheduling with availability constraints. | 2003-11-17 | Paper |
A concise survey of scheduling with time-dependent processing times | 2003-10-14 | Paper |
Single machine scheduling of unit-time jobs with controllable release dates | 2003-09-15 | Paper |
Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. | 2003-07-30 | Paper |
On scheduling an unbounded batch machine | 2003-05-04 | Paper |
Scheduling start time dependent tasks with deadlines and identical initial processing times on a single machine | 2003-04-28 | Paper |
Common due date assignment and scheduling with ready times | 2003-04-02 | Paper |
An unconstrained optimization problem is NP-hard given an oracle representation of its objective function: a technical note | 2003-04-02 | Paper |
Minimizing weighted number of early and tardy jobs with a common due window involving location penalty | 2002-08-20 | Paper |
Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints | 2002-08-18 | Paper |
The complexity of single machine scheduling with two distinct deadlines and identical decreasing rates of processing times | 2002-08-06 | Paper |
Scheduling groups of unit length jobs on two identical parallel machines. | 2002-07-25 | Paper |
Two-machine flowshop scheduling with consecutive availability constraints | 2002-07-25 | Paper |
Heuristics for two-machine no-wait flowshop scheduling with an availability constraint | 2002-07-25 | Paper |
Scheduling with job release dates, delivery times and preemption penalties | 2002-07-14 | Paper |
Single supplier scheduling for multiple deliveries | 2002-06-09 | Paper |
Single machine scheduling with step-deteriorating processing times | 2002-05-14 | Paper |
Parallel machine batching and scheduling with deadlines | 2001-12-05 | Paper |
A note on the complexity of family scheduling to minimize the number of late jobs | 2001-10-14 | Paper |
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan | 2001-07-23 | Paper |
Single machine scheduling with learning effect considerations | 2001-06-14 | Paper |
Single machine scheduling with deadlines and increasing rates of processing times | 2001-04-09 | Paper |
Multiple-machine scheduling with earliness, tardiness and completion time penalties | 2001-04-02 | Paper |
An improved heuristic for two-machine flowshop scheduling with an availability constraint | 2001-03-29 | Paper |
Single-machine scheduling with a common due window | 2001-03-12 | Paper |
A permutation flow-shop scheduling problem with convex models of operation processing times | 2001-01-17 | Paper |
Single machine batch scheduling with resource dependent setup and processing times | 2001-01-01 | Paper |
Proportionate flow shop with controllable processing times | 2000-04-03 | Paper |
The principles and laws of general systems and their applications | 2000-03-28 | Paper |
Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness | 1999-11-29 | Paper |
The structural model of general systems and its proof | 1999-11-10 | Paper |
One-operator-two-machine flowshop scheduling with setup and dismounting times | 1999-09-22 | Paper |
The time dependent machine makespan problem is strongly NP-complete | 1999-09-22 | Paper |
Theory and practice of manufacturing strategy | 1999-03-01 | Paper |
Single machine scheduling with batch deliveries | 1999-02-22 | Paper |
https://portal.mardi4nfdi.de/entity/Q4394624 | 1998-12-02 | Paper |
Multi-machine scheduling with variance minimization | 1998-07-28 | Paper |
Bicriterion Single Machine Scheduling with Resource Dependent Processing Times | 1998-05-12 | Paper |
Scheduling to minimize the total compression and late costs | 1998-03-25 | Paper |
Two-stage flowshop scheduling with a common second-stage machine | 1998-03-23 | Paper |
Single-machine scheduling with trade-off between number of tardy jobs and resource allocation | 1997-08-07 | Paper |
Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties | 1997-06-12 | Paper |
Batch scheduling and common due-date assignment on a single machine | 1997-01-06 | Paper |
Single machine batch scheduling with deadlines and resource dependent processing times | 1996-10-20 | Paper |
Single Machine Group Scheduling with Two Ordered Criteria | 1996-09-26 | Paper |
Scheduling to minimize release-time resource consumption and tardiness penalties | 1996-09-15 | Paper |
Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties | 1996-01-17 | Paper |
Parallel machine scheduling to minimize costs for earliness and number of tardy jobs | 1995-07-13 | Paper |
Processing-plus-wait due dates in single-machine scheduling | 1995-07-03 | Paper |
Parallel Machine Scheduling with Batch Setup Times | 1995-05-23 | Paper |
The parallel machine min-max weighted absolute lateness scheduling problem | 1995-03-15 | Paper |
Batch Delivery Scheduling on a Single Machine | 1995-01-12 | Paper |
Optimal assignment of due-dates for preemptive single-machine scheduling | 1995-01-11 | Paper |
Single-machine scheduling to minimize the weighted number of early and tardy agreeable jobs | 1995-01-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q4303372 | 1994-10-04 | Paper |
One-machine batching and sequencing of multiple-type items | 1994-09-05 | Paper |
Resource optimal control in some single-machine scheduling problems | 1994-08-21 | Paper |
https://portal.mardi4nfdi.de/entity/Q4284154 | 1994-06-12 | Paper |
The Assessment of Reservation Prices of an Intermediate R&D Result and Patent Reward Under Oligopolistic Competitive Behaviour | 1994-05-05 | Paper |
Single-machine scheduling to minimize earliness and number of tardy jobs | 1994-04-27 | Paper |
Optimal scheduling in film production to minimize talent hold cost | 1994-04-27 | Paper |
https://portal.mardi4nfdi.de/entity/Q4286082 | 1994-03-27 | Paper |
Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem | 1994-01-02 | Paper |
https://portal.mardi4nfdi.de/entity/Q3142063 | 1993-12-02 | Paper |
https://portal.mardi4nfdi.de/entity/Q5287171 | 1993-08-30 | Paper |
A note on one-processor scheduling with asymmetric earliness and tardiness penalties | 1993-08-16 | Paper |
A review of stochastic modelling of delay and capacity at unsignalized priority intersections | 1993-01-16 | Paper |
Optimal replacement of ageing equipment using geometric programming | 1993-01-16 | Paper |
https://portal.mardi4nfdi.de/entity/Q3987785 | 1992-06-28 | Paper |
Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine | 1992-06-26 | Paper |
Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop | 1992-06-25 | Paper |
A note on probability assignments in estimating the time to solve linear programs | 1991-01-01 | Paper |
Stochastic modelling of reservoir operations | 1991-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3354733 | 1991-01-01 | Paper |
EPQ with Process Capability and Quality Assurance Considerations | 1991-01-01 | Paper |
Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop | 1991-01-01 | Paper |
The NP-completeness of the \(n/m/parallel/C_{\max}\) preemptive due-date scheduling problem | 1990-01-01 | Paper |
A note on a proof of SPT optimality for single-machine sequencing problems via the transportation problem | 1990-01-01 | Paper |
A decision support system for materials requirements planning lot-sizing | 1990-01-01 | Paper |
A note on a partial search algorithm for the single-machine optimal common due-date assignment and sequencing problem | 1990-01-01 | Paper |
Dynamic programming approach to the single-machine sequencing problem with different due-dates | 1990-01-01 | Paper |
A state-of-the-art review of parallel-machine scheduling research | 1990-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5750703 | 1990-01-01 | Paper |
Minimizing flowtime and missed due-dates in single-machine sequencing | 1990-01-01 | Paper |
Economic production quantity for profit maximization | 1990-01-01 | Paper |
Optimal due-date assignment and sequencing in a single machine shop | 1989-01-01 | Paper |
On the NP-completeness of the n/m/parallel/\(\sum_{i\leq i\leq m}\{\sum w_ j\sum t_ j\}\) scheduling problem | 1989-01-01 | Paper |
Optimal assignment of slack due-dates and sequencing in a single-machine shop | 1989-01-01 | Paper |
An economic order quantity model with demand-dependent unit cost | 1989-01-01 | Paper |
Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem | 1989-01-01 | Paper |
An economic production quantity model with flexibility and reliability considerations | 1989-01-01 | Paper |
Optimal production policy for decaying items with decreasing demand | 1989-01-01 | Paper |
A Heuristic for Common Due-date Assignment and Job Scheduling on Parallel Machines | 1989-01-01 | Paper |
Comparison of EOQ-independent lot-sizing heuristic rules | 1989-01-01 | Paper |
Optimal common due-date with limited completion time deviation | 1988-01-01 | Paper |
An alternative proof of optimality for the common due-date assignment problem | 1988-01-01 | Paper |
On a single-machine optimal constant due-date assignment and sequencing problem | 1988-01-01 | Paper |
Simulation study of job shop scheduling with due dates | 1988-01-01 | Paper |
Optimal constant due-date assignment and sequencing | 1988-01-01 | Paper |
Integration of priority dispatching and due-date assignment in a job shop | 1988-01-01 | Paper |
Optimal total-work-content-power due-date determination and sequencing | 1987-01-01 | Paper |
An algorithm for the CON due-date determination and sequencing problem | 1987-01-01 | Paper |
Minimizing the maximum deviation of job completion time about a common due-date | 1987-01-01 | Paper |
Further extensions of a student-related optimal control problem | 1987-01-01 | Paper |
Minimizing the average deviation of job completion times about a common due-date: An extension | 1987-01-01 | Paper |
Optimal due-date determination and sequencing with random processing times | 1987-01-01 | Paper |
Optimal Replacement Planning by Geometric Programming | 1987-01-01 | Paper |
Optimal TWK-power due-date determination and sequencing | 1987-01-01 | Paper |
EOQ with limited backorder delays | 1986-01-01 | Paper |
Optimal due-date assignment in a job shop† | 1986-01-01 | Paper |
Optimal due-date assignment for a single machine sequencing problem with random processing times | 1986-01-01 | Paper |
Capacity requirements planning by stochastic linear programming | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3755216 | 1986-01-01 | Paper |
On Optimal Common Due-Date Determination | 1986-01-01 | Paper |
A Note on the Common Due-Date Assignment Problem | 1986-01-01 | Paper |
Analytical determination of optimal TWK due-dates in a job shop | 1985-01-01 | Paper |
Analysis of Job Flow-Time in a Job Shop | 1985-01-01 | Paper |
Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine | 1984-01-01 | Paper |