Optimal assignment of slack due-dates and sequencing in a single-machine shop
From MaRDI portal
Publication:917429
DOI10.1016/0893-9659(89)90081-5zbMath0704.90044OpenAlexW2004021571MaRDI QIDQ917429
Publication date: 1989
Published in: Applied Mathematics Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0893-9659(89)90081-5
Related Items (7)
Optimal assignment of due-dates for preemptive single-machine scheduling ⋮ A note: minmax due-date assignment problem with lead-time cost ⋮ Optimal assignment of NOP due-dates and sequencing in a single machine shop ⋮ Scheduling with due date assignment under special conditions on job processing ⋮ Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method ⋮ A note on optimal assignment of slack due-dates in single-machine scheduling ⋮ Optimal assignment of slack due-date and sequencing in a single machine shop
Cites Work
This page was built for publication: Optimal assignment of slack due-dates and sequencing in a single-machine shop