A note on optimal assignment of slack due-dates in single-machine scheduling
From MaRDI portal
Publication:1310016
DOI10.1016/0377-2217(93)90242-FzbMath0794.90023MaRDI QIDQ1310016
Publication date: 20 December 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (5)
A note: minmax due-date assignment problem with lead-time cost ⋮ Scheduling problems with partially ordered jobs ⋮ Scheduling with due date assignment under special conditions on job processing ⋮ Single machine scheduling with precedence constraints and positionally dependent processing times ⋮ Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method
Cites Work
- Unnamed Item
- Unnamed Item
- Optimal assignment of slack due-date and sequencing in a single machine shop
- Optimal due-date assignment and sequencing in a single machine shop
- Optimal assignment of slack due-dates and sequencing in a single-machine shop
- Survey of scheduling research involving due date determination decisions
- Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine
- Sequencing with Earliness and Tardiness Penalties: A Review
- On the Assignment of Optimal Due Dates
- Due Date Assignment for Production Systems
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: A note on optimal assignment of slack due-dates in single-machine scheduling