On the Assignment of Optimal Due Dates
From MaRDI portal
Publication:3829341
DOI10.1057/JORS.1989.9zbMATH Open0674.90052OpenAlexW2067551214MaRDI QIDQ3829341FDOQ3829341
Authors: Kenneth R. Baker, Gary D. Scudder
Publication date: 1989
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1989.9
Recommendations
Cited In (20)
- A dominant subset of \(V\)-shaped sequences for a class of single machine sequencing problems
- Exponential time algorithms for just-in-time scheduling problems with common due date and symmetric weights
- Setting due dates in a stochastic single machine environment
- Satisfying due dates in large job shops
- CON due-date determination and sequencing
- A Generalized Model of Optimal Due-Date Assignment by Linear Programming
- On Optimal Common Due-Date Determination
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Job sequencing and due date assignment in a single machine shop with uncertain processing times
- Title not available (Why is that?)
- Setting optimal due dates in a basic safe-scheduling model
- Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows
- Scheduling to minimize weighted earliness and tardiness about a common due-date
- Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method
- A note on optimal assignment of slack due-dates in single-machine scheduling
- The stochastic single machine scheduling problem with earliness and tardiness costs
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
- Effects of change of scale on optimality in a scheduling model with priorities and earliness/tardiness penalties
- Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
This page was built for publication: On the Assignment of Optimal Due Dates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3829341)