Batch delivery scheduling with batch delivery cost on a single machine
From MaRDI portal
Publication:852935
Recommendations
- Batch Delivery Scheduling on a Single Machine
- Single-machine batch scheduling minimizing weighted flow times and delivery costs
- Single machine batch scheduling with release times and delivery costs
- Single machine scheduling with batch deliveries
- Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 522739 (Why is no real title available?)
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- A polynomial algorithm for a one machine batching problem
- Batch Delivery Scheduling on a Single Machine
- Batch sizing and job sequencing on a single machine
- One-pass batching algorithms for the one-machine problem
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties
- Single machine scheduling with batch deliveries
- The complexity of one-machine batching problems
Cited in
(22)- Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan
- Batch Delivery Scheduling on a Single Machine
- Parallel-machine scheduling to minimize flowtime, holding, and batch delivery costs
- Coordinated scheduling of the outsourcing, in-house production and distribution operations
- Batch delivery scheduling with multiple decentralized manufacturers
- Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation
- Single machine batch scheduling with release times and delivery costs
- Minimizing maximum tardiness and delivery costs with batch delivery and job release times
- A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs
- Single machine scheduling with dynamic delivery cost and fixed delivery dates
- Single-machine batch scheduling of linear deteriorating jobs
- Single batch machine scheduling with deliveries
- Single machine scheduling with batch deliveries
- Two-agent supply chain scheduling problem to minimize the sum of the total weighted completion time and batch cost
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery
- A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
- Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations
- Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval
- Single-machine batch scheduling minimizing weighted flow times and delivery costs
- Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs
- A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs
- Integrated scheduling of production and distribution with release dates and capacitated deliveries
This page was built for publication: Batch delivery scheduling with batch delivery cost on a single machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q852935)