Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties
From MaRDI portal
Recommendations
- SINGLE MACHINE SCHEDULING WITH JOB DELIVERY TO MINIMIZE MAKESPAN
- Single-machine scheduling to minimize earliness and number of tardy jobs
- Single machine scheduling with batch deliveries
- scientific article; zbMATH DE number 866105
- Single batch machine scheduling with deliveries
- Single-machine batch scheduling minimizing weighted flow times and delivery costs
- Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines
- Single machine scheduling to minimize the number of early and tardy jobs
- Single machine scheduling with flow time and earliness penalties
- OPTIMAL SINGLE-MACHINE SCHEDULING FOR MINIMIZING THE SUM OF EARLINESS AND TARDINESS PENALTIES
Cited in
(22)- Single machine scheduling with batch deliveries
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Parallel machine batching and scheduling with deadlines
- Single machine scheduling with job delivery to multiple customers
- Batch delivery scheduling with multiple decentralized manufacturers
- Scheduling with job delivery coordination on single machine
- Two-machine flowshop batching and scheduling
- Scheduling with batching: A review
- A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
- An uncertain programming model for single machine scheduling problem with batch delivery
- Scheduling in a two-stage supply chain with uncertain parameters
- Single machine scheduling to minimize the setup time and the earliness
- scientific article; zbMATH DE number 522739 (Why is no real title available?)
- Batch Delivery Scheduling on a Single Machine
- Integrated scheduling of production and delivery on a single machine with availability constraint
- Single machine scheduling with batch delivery to multiple customers in a star-shaped network
- scientific article; zbMATH DE number 1437089 (Why is no real title available?)
- Parallel-machine scheduling to minimize flowtime, holding, and batch delivery costs
- Batch delivery scheduling with batch delivery cost on a single machine
- Single processor scheduling with job values depending on their completion times
- A zero-inventory production and distribution problem with a fixed customer sequence
- Production scheduling with supply and delivery considerations to minimize the makespan
This page was built for publication: Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4340803)