Two‐machine flowshop scheduling with conditional deteriorating second operations
From MaRDI portal
Publication:5488249
Recommendations
- A Two-Stage Flexible Flowshop Problem with Deterioration
- Two-machine job shop scheduling with deteriorating jobs
- A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Two-machine flow-shop scheduling with deterioration and rejection
Cites work
Cited in
(7)- Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines
- Relocation scheduling subject to fixed processing sequences
- Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type
- Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
- The Browne-Yechiali single-machine sequence is optimal for flow-shops
- Scheduling with centralized and decentralized batching policies in concurrent open shops
- A Two-Stage Flexible Flowshop Problem with Deterioration
This page was built for publication: Two‐machine flowshop scheduling with conditional deteriorating second operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5488249)