Proportionate flow shop with controllable processing times
From MaRDI portal
Publication:1964482
DOI10.1002/(SICI)1099-1425(199911/12)2:6%3C253::AID-JOS30%3E3.0.CO;2-RzbMATH Open0949.90039MaRDI QIDQ1964482FDOQ1964482
T. C. Edwin Cheng, N. V. Shakhlevich
Publication date: 3 April 2000
Published in: Journal of Scheduling (Search for Journal in Brave)
Recommendations
- Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
- Minimizing total weighted completion time in a proportionate flow shop
- The three-machine proportionate flow shop problem with unequal machine speeds
- A two-machine flow shop scheduling problem with controllable job processing times
- Proportionate flowshops with general position-dependent processing times
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A survey of results for sequencing problems with controllable processing times
- Complexity of single machine hierarchical scheduling: A survey
- A two-machine flow shop scheduling problem with controllable job processing times
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- Focused Scheduling in Proportionate Flowshops
- Title not available (Why is that?)
- Minimizing total weighted completion time in a proportionate flow shop
- An approximation algorithm for the \(m\)-machine permutation flow shop scheduling problem with controllable processing times
- A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine
Cited In (12)
- Two-machine flow shop scheduling with convex resource consumption functions
- Focused Scheduling in Proportionate Flowshops
- The three-machine proportionate flow shop problem with unequal machine speeds
- Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness
- A survey of scheduling with controllable processing times
- Proportionate flow shop games
- Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
- Two-stage proportionate flexible flow shop to minimize the makespan
- A search method for optimal control of a flow shop system of traditional machines
- Multicriteria scheduling
- Approximation schemes for parallel machine scheduling problems with controllable processing times
- Approximation schemes for job shop scheduling problems with controllable processing times
This page was built for publication: Proportionate flow shop with controllable processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1964482)