Scheduling groups of unit length jobs on two identical parallel machines.
From MaRDI portal
(Redirected from Publication:1606911)
Recommendations
Cites work
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- scientific article; zbMATH DE number 44978 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Parallel Machine Scheduling with Batch Setup Times
Cited in
(7)- Is a unit-job shop not easier than identical parallel machines?
- Batch scheduling on uniform machines to minimize total flow-time
- The complexity of two group scheduling problems
- Scheduling jobs of equal length: Complexity, facets and computational results
- A survey of scheduling problems with setup times or costs
- A batch scheduling problem with two agents
- Scheduling jobs of equal length: complexity, facets and computational results
This page was built for publication: Scheduling groups of unit length jobs on two identical parallel machines.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1606911)