A batch scheduling problem with two agents
From MaRDI portal
Recommendations
- Two-agent scheduling on a single sequential and compatible batching machine
- Scheduling Problems with Two Competing Agents
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
- Two-agent scheduling on an unbounded serial batching machine
- Bounded parallel-batching scheduling with two competing agents
- Serial-batching scheduling with two agents to minimize makespan and maximum cost
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
- Multitasking scheduling problems with two competitive agents
- Scheduling two agents with controllable processing times
- A just-in-time scheduling problem with two competing agents
Cites work
- A survey of scheduling problems with setup times or costs
- Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Principles of Sequencing and Scheduling
- Scheduling groups of unit length jobs on two identical parallel machines.
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- Scheduling Problems with Two Competing Agents
- Single machine batch scheduling with two competing agents to minimize total flowtime
- Two-agent single-machine scheduling with assignable due dates
Cited in
(13)- Complexities of four problems on two-agent scheduling
- Two-agent supply chain scheduling problem to minimize the sum of the total weighted completion time and batch cost
- Single machine batch scheduling with two non-disjoint agents and splitable jobs
- A just-in-time scheduling problem with two competing agents
- Parallel-batch scheduling with multi-agent jobs to minimize the weighted number of tardy jobs
- Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
- SCHEDULING TWO SALESMEN IN A NETWORK
- Scheduling Problems with Two Competing Agents
- Two-agent scheduling on a single sequential and compatible batching machine
- Two-machine and two-agent flow shop with special processing times structures
- Two-agent scheduling problem about tardiness on a single machine
- Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignment
This page was built for publication: A batch scheduling problem with two agents
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2788524)