Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
From MaRDI portal
Publication:3120079
DOI10.1002/nav.21813zbMath1407.90185OpenAlexW2902280070WikidataQ128874770 ScholiaQ128874770MaRDI QIDQ3120079
Yunqiang Yin, Chin-Chia Wu, Du-Juan Wang, Cheng, T. C. Edwin, Yong-jian Yang
Publication date: 1 March 2019
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.21813
2-person games (91A05) Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05)
Related Items (16)
Multitasking scheduling problems with two competitive agents ⋮ Minimizing maximum tardiness on a single machine with family setup times and machine disruption ⋮ Scheduling with competing agents, total late work and job rejection ⋮ Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs ⋮ Two‐agent scheduling with linear resource‐dependent processing times ⋮ Common due-window assignment and minmax scheduling with resource allocation and group technology on a single machine ⋮ Serial-batching scheduling with two agents to minimize makespan and maximum cost ⋮ Scheduling two projects with controllable processing times in a single-machine environment ⋮ Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing ⋮ Flow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent Weights ⋮ Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights ⋮ Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms ⋮ Two-agent integrated scheduling of production and distribution operations with fixed departure times ⋮ Due date assignment and two-agent scheduling under multitasking environment ⋮ Due-window assignment scheduling with learning and deterioration effects ⋮ Two-machine flow shop scheduling with a common due date to maximize total early work
This page was built for publication: Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents